Flood defences
At the launch of Future flood prevention, a report calling for changes to flood management in England to tackle the rising threat posed by climate change, Neil Parish, Conservative MP for Tiverton and Honiton, said, "Some five million people in England are at risk of flooding. Winter 2015-16 broke rainfall records. Storms Desmond, Eva and Frank disrupted communities across northern parts of the UK, with Desmond alone costing the UK more than £5 billion.
Flood defences are used to prevent or control the potential negative effects of flood waters. Traditional methods of flood defence, such as the planting of vegetation to retain water and constructing channels (floodways), have been used throughout history. More modern flood defences can include:
- Dams.
- Diversion canals.
- Floodplains and groundwater replenishment.
- River defences, e.g. levees, bunds, reservoirs, weirs, and so on.
- Coastal defences, e.g. groynes, sea walls, revetments, gabions, and so on.
- Retention ponds.
- Moveable gates and barriers.
Temporary flood defences are systems that can be brought to specific problem sites to provide flood defence as required. They can then be removed until needed again, either at the same or a different location. They have no fixed foundation other than the ground on which they are based with perhaps minor pre-prepared modifications to ensure proper stability or performance of the equipment.
They might include:
Temporary barriers generally do provide the same level of protection as permanent defences and typically have failure rates of 20-30%, although this can be reduced by good advanced planning.
For more information see: Temporary flood defences.
[edit] Related articles on Designing Buildings
Featured articles and news
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
Comments